Capacity and delay analysis for airport manoeuvring areas using simulation
AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, cilt.86, sa.1, ss.43-55, 2014 (SCI-Expanded, Scopus)
- Yayın Türü: Makale / Tam Makale
- Cilt numarası: 86 Sayı: 1
- Basım Tarihi: 2014
- Doi Numarası: 10.1108/aeat-04-2012-0058
- Dergi Adı: AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY
- Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
- Sayfa Sayıları: ss.43-55
- Anahtar Kelimeler: Aerodrome control, Airport manoeuvring area, Fast time simulation, Real-time simulation
- Anadolu Üniversitesi Adresli: Evet
Özet
Purpose - The aim of this study is to identify the nodes where congestion occurs in the manoeuvring area of a large-scale airport and to provide appropriate suggestions for improvement.